Every task from the Launch Coach, its status, and its proof of work. The agent executes each day, sends designs/copies for sign-off, and logs the artifact here. Nothing slips through.
| Day | Task | Status | Proof of work |
|---|---|---|---|
| Welcome 25 Aug |
Launch coach introduction โ asked which phase you're in (pre-launch / mid-launch / post-launch). | โ ANSWERED โ pre-launch | Answered 28 Aug: pre-launch (building offers and systems). Days 1โ3 delivered as catch-up below. |
| Day 1โ3 26 Aug |
The Day 1โ3 tasks were never delivered โ the 26 Aug automation run failed with a gateway error (502, since fixed). | โ DONE (catch-up) | Executed as catch-up: Day 1 foundation ยท Day 2 bios & social copy ยท Day 3 30-day content calendar โ Launch Foundation page |
| Day 4 27 Aug |
Lock in your first digital product: "The 5-Minute Reset" PDF guide + sales copy. | โ DONE | Product page ยท PDF (200) |
| Day 5 28 Aug |
Merch drop: "I'm not broken. I'm adapting." โ Option B approved, print-correct tee design. | โ DONE | Merch page ยท Approved design ยท Printful pack |
| Day 6+ 29 Aug โ |
Future daily tasks โ delivered daily at 11:20 by the Launch Coach automation, executed by the agent, logged here. | AUTO | Next run: 29 Aug 11:20. Each day's artifact will appear in this table. |
The 26 Aug 502 failure is the only gap in the program's delivery history โ caused by the gateway port bug that was fixed and verified earlier. No future failures are expected; the System Watch emails you the moment anything breaks.
๐ด๓ ง๓ ข๓ ณ๓ ฃ๓ ด๓ ฟ Darren Houston Limited ยท SยทOS ยท ๐ณ๏ธโ๐ Everyone welcome ยท Love is love ยท No one left behind